Skip to content

Regression Tests

Regression Tests #8810

Triggered via schedule December 7, 2025 00:19
Status Failure
Total duration 56m 14s
Artifacts 1

regression-tests.yml

on: schedule
lint-test-chart
3m 38s
lint-test-chart
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (ubuntu-dev:20, Uring, Release, self-hosted, linux, ARM64)
Process completed with exit code 1.
build (ubuntu-dev:20, Uring, Release, ubuntu-latest)
The strategy configuration was canceled because "build.ubuntu-dev_20_Uring_Rel_2" failed
build (ubuntu-dev:20, Uring, Release, ubuntu-latest)
The operation was canceled.
build (ubuntu-dev:20, Uring, Debug, ubuntu-latest)
The strategy configuration was canceled because "build.ubuntu-dev_20_Uring_Rel_2" failed
build (ubuntu-dev:20, Uring, Debug, ubuntu-latest)
The operation was canceled.
build (ubuntu-dev:20, Uring, Debug, self-hosted, linux, ARM64)
The strategy configuration was canceled because "build.ubuntu-dev_20_Uring_Rel_2" failed
build (ubuntu-dev:20, Uring, Debug, self-hosted, linux, ARM64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
logs
8.26 KB
sha256:3c8f1f26b0c793b8d8fc653ae18af17cd046f476dffa53f92b8c2c46049b9bbc