Skip to content

chore(deps): update dependency husky to v9.1.7 #2521

chore(deps): update dependency husky to v9.1.7

chore(deps): update dependency husky to v9.1.7 #2521

Triggered via push December 3, 2025 06:52
Status Failure
Total duration 45s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

11 errors
verify-matrix (14.0.0)
Process completed with exit code 1.
verify-matrix (16.0.0)
The strategy configuration was canceled because "verify-matrix._14_0_0" failed
verify-matrix (16.0.0)
The operation was canceled.
verify-matrix (14)
The strategy configuration was canceled because "verify-matrix._14_0_0" failed
verify-matrix (14)
The operation was canceled.
verify-matrix (18)
The strategy configuration was canceled because "verify-matrix._14_0_0" failed
verify-matrix (18)
The operation was canceled.
verify-matrix (19)
The strategy configuration was canceled because "verify-matrix._14_0_0" failed
verify-matrix (19)
The operation was canceled.
verify-matrix (16)
The strategy configuration was canceled because "verify-matrix._14_0_0" failed
verify-matrix (16)
The operation was canceled.